Realized projects

Réalisation Ceilings

Musée de la Grande Guerre du Pays de Meaux (77)

Architect : Atelier Lab

Location

MEAUX (77)

 

Architect

ATELIER LAB (PARIS)

 

Product

TuboLine plate

 

Date

2011

 

Category

CEILINGS

 

About this project

To fit out the false ceilings in the museum's administrative offices, several criteria had to be met. On the one hand, a modern feel had to be maintained through the use of a metallic material, indirect lighting had to be integrated and the acoustic function had to be ensured. The choice fell on Ralf's Généracoustic complex, which firstly offers acoustic performance thanks to its structure. Secondly, this aluminum product lends itself perfectly to bending and the creation of trays.

Hook-on trays measuring 600 x 2000 mm were mounted on an invisible framework. Suspended light fixture covers were made in the same material to maintain a harmonious unity.
 

Photos : Afracom